
Went in cleanly and I'm very happy with how the bay portion of the install turned out. Now on to the hard part... figuring out where/how to mount the Snow Stg. 3 controller without looking like I installed a Stg. 3 Controller!

Here's some pics for reference!
Cheers,
KS
Managed to pack it all (Pump, Check & solenoid valve and filter) right behind the headlight. Pull the air intakes and you have fairly easy access to everything you might need to get at.
20250301_170106.jpg
With the headlight and core support installed, there is little extra room, but it all clears and fits.
[20250301_170056.jpg
I decided to put the nozzles where I did as there are 2 mold injection points equidistant from the ins & outs of the plenum. I figured the plastic might be a little thicker there and drilled away!
20241109_151541.jpg
I jumped on the laser at work and cut a bunch of stainless up for mounting plates. Silicone gaskets and just a drop of sealant should be good for more PSI than I'm willing to toss at a stock block!
20241109_152018.jpg
The finished product. These lines are inches behind a 200F blast furnace called the radiator, so I covered them in some high temp sheathing to give the plastic the best chance to survive the hostile environment there. Only time will tell!
20241109_171818.jpg
20241109_181210.jpg
Bookmarks