So I spent 4 hours under the car putting in my test pipe last weekend. The bolts where frozen on the TP to Down pipe joint so I had to cut it at the exhaust sleeve (because the nuts where rusted through) pull out the whole assembly and saw off the bolts. Pretty much a 2 hour job became a 4 hour job because of rusted/frozen bolts. It is faster and I love the new sounds. And I got to learn a lot about the undercarriage
awww look at the wittle baby tuwbo.
Bookmarks